(1)
Cost Analysis of the Construction Safety Management System (SMKK) Based on Work Breakdown Structure (WBS) in an Irrigation Project. JPMR 2025, 1 (2), 47-62. https://doi.org/10.65303/journalpmresearch.v1i2.35.