[1]
“Cost Analysis of the Construction Safety Management System (SMKK) Based on Work Breakdown Structure (WBS) in an Irrigation Project”, JPMR, vol. 1, no. 2, pp. 47–62, Oct. 2025, doi: 10.65303/journalpmresearch.v1i2.35.